Designed by HS2’s contractor EKFB, the 99m-wide Turweston Green Bridge is the high-speed railway project’s largest green bridge near Brackley, UK.
Tag: Eiffage
HS2 completes deck beam installation for Highfurlong Brook Viaduct
716 views
HS2’s main contractor, EKFB, have completed the deck beam installation for the Highfurlong Brook Viaduct in Northamptonshire, UK.
Beams lifted for HS2’s Thame Valley Viaduct
799 views
The first of 72 huge beams have been lifted by two massive cranes to support the deck of HS2’s Thame Valley Viaduct in the UK.
First steel beams delivered for HS2’s low carbon Wendover Viaduct
962 views
The 25m steel beams forming the low-carbon structure of HS2’s Wendover Dean Viaduct have been delivered before the start of construction.
HS2’s 345m Small Dean Viaduct given green light
1161 views
HS2’s 345m Small Dean Viaduct design has been given the green light, as construction continues to ramp up on UK’s high speed railway.