Designed by HS2’s contractor EKFB, the 99m-wide Turweston Green Bridge is the high-speed railway project’s largest green bridge near Brackley, UK.
Tag: Ferrovial
Project Spotlight: Thames Tideway Tunnel
728 views
The 25km Thames Tideway Tunnel is a water treatment project to improve the River Thames’ water quality and address environmental concerns.
HS2 completes deck beam installation for Highfurlong Brook Viaduct
716 views
HS2’s main contractor, EKFB, have completed the deck beam installation for the Highfurlong Brook Viaduct in Northamptonshire, UK.
Project Spotlight: Silvertown Tunnel
807 views
The Silvertown Tunnel project in London involves constructing a new twin-bore road tunnel to improve congestion and transportation.
Beams lifted for HS2’s Thame Valley Viaduct
799 views
The first of 72 huge beams have been lifted by two massive cranes to support the deck of HS2’s Thame Valley Viaduct in the UK.
Ferrovial adopts stakeout robot and increases on-site productivity
902 views
Ferrovial has adopted a stakeout robot to increase productivity and provide accurate topographic measurements in construction projects.
First steel beams delivered for HS2’s low carbon Wendover Viaduct
962 views
The 25m steel beams forming the low-carbon structure of HS2’s Wendover Dean Viaduct have been delivered before the start of construction.
Ferrovial launches pioneering generative AI assistant for employees
1181 views
Ferrovial is the first infrastructure company to provide its employees with a generative artificial intelligence tool to increase efficiency.
HS2’s 345m Small Dean Viaduct given green light
1160 views
HS2’s 345m Small Dean Viaduct design has been given the green light, as construction continues to ramp up on UK’s high speed railway.
Ferrovial introduces wearables to reduce risk on construction sites
1292 views
Ferrovial has successfully tested a system of wearables to improve safety conditions for workers on-site and users of its infrastructure.
Ferrovial completes sale of Amey Group for £400m to a UK company
1494 views
Ferrovial completes the sale of Amey Group to a UK company controlled by funds managed by One Equity Partners and Buckthorn Partners.
1.9 million cubic metres of rock and earth to be excavated as work starts on two of HS2’s longest cuttings
1744 views
HS2 main works contractor EKFB has started excavation of the two longest cuttings which will see the removal of 1.9 million cubic metres of rock and earth.