The cost of the Snowy 2.0 pumped hydro project in New South Wales has been revised to a cost of $12bn, six times the original forecast.
1064 views
The cost of the Snowy 2.0 pumped hydro project in New South Wales has been revised to a cost of $12bn, six times the original forecast.